Q. Which of the following hydroelectric projects and respective rivers these are built on are matched correctly?
Tapovan Vishnugad Project – Chenab
Kiru Project – Dhauliganga
Pakal Dul Project – Marusudar
Kinnaur Project – Sutlej
Choose the correct answer using the codes given below: Answer:
Only 3 & 4
Notes:
The Tapovan Vishnugad Hydropower Plant is a 520 MW run-of-river hydroelectric project being constructed on Dhauliganga River in Chamoli District of Uttarakhand.
Kiru hydroelectric power project is a run-of-the-river scheme being developed over the Chenab River in the Kishtwar Tehsil of Doha district in Jammu and Kashmir.
The Pakal Dul Dam is an under-construction project on the Marusudar river, a tributary of the Chenab River, in Kishtwar district of Jammu and Kashmir.
The Kinnaur Hydroelectric Plant is a 1,000 megawatts run-of-the-river hydroelectric power station on the Sutlej River in Kinnaur district of Himachal Pradesh, India.